Installing a uPVC window with a static connector – How to install correctly? 

Factors such as ease of transport, simplified window installation, atmospheric influences, and overall structural stability can inform the decision to divide window assemblies. Given the range of connectors available, selecting one based on its static properties is essential.

Ensuring reinforcements are properly secured can greatly increase the window set’s resistance to forces acting on the building. It is important that the connector is not always fixed permanently. This principle is elaborated on in the later sections of our article.

Why do we divide window constructions into parts?

Window constructions are worth dividing in cases where:

  • When dealing with large sizes, segmentation helps save on transportation costs and allows for faster, effortless installation.
  • To prevent issues and complaints related to the adverse effects of sun and wind exposure.
  • Focusing on appropriate structural statics enhances the profiles’ resistance to deformation.

Dividing window sets into smaller components facilitates the transportation and installation of ordered windows. The conditions at the installation site determine the dimensions for delivery.

The impact of solar radiation is significant, especially for constructions with long, undivided glass panes. Due to thermal expansion, dividing these structures into smaller elements is advised.

uPVC material reacts notably to temperature changes. A meter of white uPVC profile can expand by 0.28 in (0.276 inches) with a 50°F temperature difference. For colored profiles, the expansion might be double, given the surface temperature difference can reach ΔT = 140°F in summer compared to 86°F for white profiles.

For windows subjected to significant structural loads from wind forces, using additional elements to improve the window’s strength properties, known as static connectors, is necessary.

Types of window connectors

Window connectors enable the connection of at least two windows, sliding doors, or the integration of several systems into a single entity. Connectors are categorized into two types: static and non-static.

Non-static connectors, which do not contain steel, are designated for smaller window sets, including:

  • White constructions up to 75.35 ft²,
  • Colored constructions up to approximately 53.8 to 64.6 ft², due to their profiles heating up more quickly,
  • Constructions that are wide but do not exceed a height of 4 ft 11.06 in,
  • Constructions that are tall but do not exceed a width of 4 ft 11.06 in.

Among the non-static connectors, dovetail connectors — also known as teardrop connectors — are notable for being the only type not visible on the profile’s surface. To connect a set, two pieces are required. The large ‘H’ connector, which comes as a single piece, thus simplifies the assembly process.

uPVC windows utilize various static connectors for joining larger structural areas. The selection of an appropriate connector is based on static calculations that determine the minimum moment of inertia required for a given connection. The chosen connector must meet or exceed the static value identified by these calculations.

A practical example would be entrance doors with a transom window above. In such cases, the structure must accommodate not only wind loads but also vibrations from frequent use. It’s important to highlight that static connectors, in contrast to their non-static counterparts, protrude significantly from the profile’s surface. Examples include a 0.35 in static connector, potentially with single or double steel filling for optimal uPVC reinforcement, and a 0.83 in static connector. The addition of steel filling enhances the static value of the connectors.

Installation of a window with a static connector – instructions

To ensure the safe bearing of forces acting on the structure, the static reinforcement used to stiffen the connection must be securely attached to the structure. It is important to remember that reinforcements should never be permanently fixed but rather allowed to move freely to compensate for movements occurring in the structure.

Remembering the principle: the window is attached to the static connector, not the connector to the window.

(1.1) In the frame profile, through holes should be drilled to mount spacer washers

(1.2). Subsequently, a corner bracket is mounted to the steel that will fill the connector, allowing the screw attached to it to move due to the thermal expansion of the profile – a sliding connection (the corner bracket is inserted into the steel) (2.1) and (2.2).

(3.1) We insert the steel into the static connector. We attach another corner bracket to the upper end of the connector (it should be noted that the static connector should be attached to the frame profile in such a way that the screw attaching the corner brackets is located at the outer edge of the frame) (4.1) and (4.2).

We connect the upper corner connector using a screw (from the outer edge of the frame) (5). After drilling holes for mounting anchor bolts, we attach the static connector to the window frame profile using screws (6).

To the second window frame of the set, we attach spacer washers in the same manner as described in the first point (7.1). We assemble the set, then embed it in the window opening using mounting screws selected according to the construction of the wall (8).

Remember to align the window vertically and horizontally!

Share this article
Kamil Karpiński debesto

about author

Kamil Karpiński

Business Consultant at debesto.com

recommended for you

How to install patio bi-fold doors? Complete Video Tutorial

Here you will learn how to install patio bi-fold doors, taking reveals into account, and use such doors as separation between two rooms. Check our article and video with bi-fold door installation instructions. What is a bi-fold door? Bi-fold doors, also known as fold doors, folding doors or folding sliding…

read more
How to install windows doors with glasslifter

How to install window or sliding doors with glasslifter?

Don’t know how to insert a lift and slide patio doors? You don’t have to! We invite you to watch an instructional video on installing lift and slide patio doors using a glass installation machine, the so-called Glasslifter. We installed patio doors in the single-family housing estate. Installation of…

read more
sash windows

Everything you need to know about English sash windows

In this article, you will learn more about English sash windows. Among others, you will find out how windows work and how they are constructed. Here you can also read about history or eventual problems that can occur during installation or when using. Sash windows – what is this?…

read more

faq

debesto.com – who are we and what do we do?

At debesto.com, we are experts in providing customized window solutions, including patio doors, blinds, entry, and garage doors, tailored to building professionals: developers, general contractors, architects, and construction project managers.   With over a decade of expertise in European windows, we specialize in assisting construction companies to import windows efficiently and profitably.   With debesto, you gain comprehensive, consultative partnerships designed to enhance your project’s success and minimize your business risk. Our customers appreciate most:
  • - cost-effectiveness
  • - deep business understanding
  • - secure on-site delivery
  • - timeliness
  • - exceptional communication and support
  • - incredibly smooth process
  Need more info? Check how to verify debesto Read what happens after booking a consultation

Delivery time, payment, installation, warranty

1. What is the delivery time on debesto.com?The time of order processing is highly dependent on its specification.

For example, white uPVC windows, standard colors (anthracite on one side) can be ready for pick up or a shipment from 7 working days. The waiting time for nonstandard uPVC colors is about 4 weeks depending on the color. The production time of uPVC doors is also about 4 weeks. Aluminum doors and windows - from 3 weeks, wooden windows from 6 weeks. Furthermore, the blinds about 2 weeks, garage doors - about 3 weeks, metallic doors from 4 weeks. You’ll find estimated production time next to every product on its subpage.

2. How does the payment look like? Do I have to pay the whole amount immediately?

We suggest two forms of payment: 1. 50% of advance for production of the product and 50% shall be paid before picking up/ sending the goods. 2. 100% payment in advance. This form is much more favorable because we give you an additional 5% discount depending on the group of products.

3. Will I buy the windows and doors with an installation on debesto.com?

No, on debesto.com we sell only windows, doors, blinds, and gates, which we deliver to every place in the world. The installation of the windows depends on the client. We do not offer installation service because our offer is not directed to the building companies, installers, developers, and realtors that can install the windows and doors by themselves.

4. If the windows would be installed by a different company, do the products keep the warranty?

Yes, the only condition is installing the product in accordance with the art of assembly and applicable standards in the country of the installation in terms of the warranty.

5. Do the products that I buy have a foreign warranty?

Yes

, the only condition is installing the product in accordance with the art of assembly and applicable standards in the country of the installation in terms of the warranty.

Transport and delivery

1. Do you have a transport in your offer?

Yes, collaborating with debesto.com you get a complex service of windows and doors order including transport. Transport is priced individually for every project. The distance and package dimensions or its elements have an impact on the price. The presence of e.g. a huge HS window may raise the price compared to the delivery of standard windows. We always look for the best transport option, which besides the competitive price guarantees safety and punctuality of the delivery. The more you order the more you save - we send goods from different places in one transport. The location ensures favorable delivery prices to many different places. If the transport offer won’t be satisfying enough you can send your own shipping or pick up the package in person.

2. what is an estimated time of the transport?

The transport time depends on the month in which the package is to arrive. To most of the countries, it is something about 3 days after packing the goods. The delivery time depends on that if the transport is dedicated (The driver is going to only one client) or in the partial load (delivery to a few clients). To countries aside from UE the time is much longer. To USA it is about 30-35 days, the delivery to Africa is very similar.

3. If I order the windows and doors from debesto.com will I get transport for free?

It is possible

- the final offer is determined with the client’s keeper. It depends on the size of the order and the place of delivery. At the same time, we always look for the best transport offer, which after summarizing with the prices of products allows the customer to save money on the import from Poland.

4. Will I definitely get the goods on time?

Don’t worry, we know how important punctuality is in our business. That is why we deliver the goods only by using certified transport companies and we order production to the verified factories. We also track the order fulfillment all the time, to react in case of delay. We always assume a margin of error and we do not promise the client unfeasible deadline. We prefer to say honestly, that the delivery will take longer than giving empty promises.

5. Are my goods insured during transport?

Yes, the package is fully insured. We deliver the goods only by using certified transport companies which have OC insurance for transported goods. If the commodity got damaged we deal with fixing the damage, so the new product can come to you as fast as possible. After that, we clarify this situation with the transport company.

6. Is it possible to get a forklift unloading at the price of the transport?

Yes, it is possible

but remember that we always explore the client’s possibilities in terms of unloading goods individually. Our experienced logistic section takes care of the transport organisation. It is also looking for the best solution for you in terms of value for money for transport to offered options such as the elevator or a forklift. In some countries, it happens that for example, it is much more profitable to rent a forklift at the location, than paying extra for it at the transport company.

Want to know how much your business can gain by importing windows from Poland?

Share this article